Europower signed on February 02, 2015 a contract with BEA – Brianza Energia Ambiente S.p.A. concerning the refurbishment of Incinerator plant in Desio – Lot 2 (thermal cycle, furnace, grate and boiler).
The contract duration will be until September 2016.